Friday, March 2, 2012

Keystone Library - Project 3.1.1

In this project, we had to add components and figure out the layout of our library.

These are the deliverables:






Reflection
I thought this project was sort of difficult because there was a lot of things to do and a lot of requirements. One of the things I would've done differently is plan out the rooms better. This would've made it easier and made it look better. I enjoyed seeing a more complete library and building at the end of this project.

No comments:

Post a Comment